
Description
Destiny Homes presents their Canyon floor plan. This ranch plan features two bedrooms, 2 bathrooms on the main floor, and 1433 square ft on the main floor. Upon entrance from the garage you will walk into a mud room featuring laundry and closet space. The kitchen is located right off the mudroom and features large walk-in pantry, oversized island, stainless steel appliances, and sliders off the dining area that lead to a covered patio. Large living boasts plenty of natural light from large picture windows and electric fireplace. Master suite features double vanity, walk-in closet, and shower. Additional lower level finish of 808 square ft includes two additional bedrooms, a full bath and a family room. There is a long list of standard features not often found at this price point, including electric fireplace, energy efficiency, 2x6 construction, and SMART Home Automation. Ask about $2,000 in closing costs provided by preferred lender. Construction has begun, estimated completion late July - early August 2022.
-
4BEDS
-
0.19ACRES
-
3BATHS
-
01/2 BATHS
-
1,433SQFT
-
$297$/SQFT
Description
Destiny Homes presents their Canyon floor plan. This ranch plan features two bedrooms, 2 bathrooms on the main floor, and 1433 square ft on the main floor. Upon entrance from the garage you will walk into a mud room featuring laundry and closet space. The kitchen is located right off the mudroom and features large walk-in pantry, oversized island, stainless steel appliances, and sliders off the dining area that lead to a covered patio. Large living boasts plenty of natural light from large picture windows and electric fireplace. Master suite features double vanity, walk-in closet, and shower. Additional lower level finish of 808 square ft includes two additional bedrooms, a full bath and a family room. There is a long list of standard features not often found at this price point, including electric fireplace, energy efficiency, 2x6 construction, and SMART Home Automation. Ask about $2,000 in closing costs provided by preferred lender. Construction has begun, estimated completion late July - early August 2022.